Unit 462 - Twin Buttes

Fort Berthold Housing Authority 

SCOPE OF WORK 

Labor provided by Contractor 

 Bids Due 9/8/2026

Unit#: 462             Project: Mod/Ren 

Segment: Twin Buttes 

Physical Address: 8133 7C ST NW 

 

Living room  

Replace 3-0’ Exterior LH Door 

Paint and primer (720 sq ft) 

Install 2 new flush mount light fixture (15”) with 2 bulbs (60 watts)  

Install 2 new interior closet door (2-0 RH) with passage doorknob and door stop  

Install new baseboard trim in living room and the inside of closets (66 linear feet)  

Install new trim around windows and interior doors (88 linear feet)   

Repair holes in drywall of various sizes. Behind entrance door and doorstop- Mud, tape, paint and texture  

Repair drywall in the living room closet (6 sq ft) Mud, tape, paint and texture  

Replace 4- white Outlet covers, 1- Flat outlet cover, 2- single gang light switch  

Install new Air Conditioner  

Bedroom #1  

Install new interior bedroom door (2-6 RH) with privacy doorknob and door stop 

Install new interior closet door (3-0 RH) with passage doorknob and door stop  

Install new flush mount light fixture (13”) with 2 bulbs (60 watts)  

Install 5 new outlet plate covers (white)  

Install new baseboard trim (46 linear feet)  

Paint and primer (636 sq ft)  

Install new trim around windows and doors (92 linear feet)  

Install closet shelving and closet rod 78” x 15”, 77” Closet rod  

Install new smoke detector (wired)  

Replace single gang light switch  

Install thermostat cover  

Bathroom  

Install new interior bathroom door (2-6 RH) with privacy doorknob and door stop  

Paint and primer (269 sqft)  

Install new trim around bathroom door (40 linear feet)  

 Install new baseboard trim (12 linear feet)  

Install 2 new bathroom towel holders (18” wide, 24” wide)  

Repair small screw holes in drywall. Mud, tape, paint and texture 

Bedroom #2  

Install new interior bedroom door (2-6 LH) with privacy doorknob and door stop  

Install new interior closet door (3-0 LH) with passage doorknob and door stop 

Install new flush mount light fixture (13”) with bulbs (60 watts) 

Install 5 new outlet plate covers (white) 

Install 1 flat outlet cover 

Install 1 single gang light switch 

Install new baseboard trim (58 linear feet) 

Install new trim around doors and windows (98 linear feet) 

Paint and primer (732 sqft) 

Remove screws and tacks in drywall 

Repair small screw holes in drywall. Mud, tape, paint and texture 

Install new closet shelving 77” x 15” 

Install closet rod with bracket 

Repair drywall in the closet (3sq ft) Mud, Tape, Texture, & paint 

Kitchen 

Paint and primer (692 sq ft) 

Install new flush mount light fixture (15”) with bulbs (60 watts) 

Install clear light cover for 4’ x 7” light fixture 

Install baseboard trim (27 linear feet) 

Install new pantry interior door (2-0 RH) with passage doorknob and door stop 

Install new trim around doors and windows (56 linear feet) 

Install 7 new outlet cover plates (white) 

Install 3 new GFCI cover plates (white) 

Install 1 flat cover plate (white) 

Install 1-14”x 7” register cover for the wall heater 

Install smoke detector (wired) 

Install new base cabinets 

● 2- 24”  

● 2- 48” blind corners  

● 36”  

● 27”  

● 21”  

Wall cabinets  

● 24”  

● 30”  

● 2- 48” blind corners  

● 2- 36”  

● 21”  

● 33”  

Countertop measurements  

24 ½”  

48 ½”west wall  

140” north wall  

70” east wall  

Install new vinyl plank flooring throughout entire unit (840 sq ft) 

 

Reminder: Dispose of all debris at an approved site. Clean the entire area around unit; this includes picking up all nails. Make sure the project is ready for final inspection.