Unit 463 - Twin Buttes

Fort Berthold Housing Authority 

SCOPE OF WORK 

Labor provided by Contractor 

 Bids are due by 9/8/2026

Unit#: 463 USDA             Project: Mod/Ren 

Segment: Twin Buttes 

Physical Address: 8133 7C ST NW 

 

Whole Unit 

Install new vinyl plank flooring throughout entire unit (840 sq ft) 

 

Living room 

Paint and primer (720 sq ft) 

Install 2 new flush mount light fixture (15”) with 2 bulbs (60 watts) 

Install 2 new interior closet door (2-0 RH) with passage doorknob and door stop 

Install new baseboard trim in living room and the inside of closets (66 linear feet) 

Install new trim around windows and interior doors (88 linear feet) 

Repair 10”x10” hole in drywall behind the front door. Mud, tape, paint and texture 

Repair drywall in the living room closet (56 sq ft) Mud, tape, paint and texture 

  

Bedroom #1 

Install new interior bedroom door (2-6 RH) with privacy doorknob and door stop 

Install new interior closet door (3-0 LH) with passage doorknob and door stop 

Install new flush mount light fixture (13”) with 2 bulbs (60 watts) 

Install 4 new outlet plate covers (white) 

Install new baseboard trim (46 linear feet) 

Paint and primer (636 sq ft) 

Install new trim around windows and doors (92 linear feet) 

 

Bathroom 

Install new interior bathroom door (2-6 RH) with privacy doorknob and door stop 

Install new bathroom vanity 36x21 with vanity top and sink 

Install new bathroom faucet (one handle) along water supply lines and P-trap (1 ¼) 

Install new vanity light fixture (2 ft) with 4 new bulbs (60 watts) 

Paint and primer (269 sqft) 

Install new bathroom exhaust fan 

Install new trim around bathroom door (40 linear feet) 

Install new baseboard trim (12 linear feet) 

Install new bathroom towel holder  

Repair small screw holes in drywall. Mud, tape, paint, and texture. 

 

Bedroom #2 

Install new interior bedroom door (2-6 LH) with privacy doorknob and door stop 

Install new interior closet door (3-0 RH) with passage doorknob and door stop 

Install new flush mount light fixture (13”) with bulbs (60 watts) 

Install 3 new outlet plate covers (white) 

Install new baseboard trim (58 linear feet) 

Install new trim around doors and windows (98 linear feet) 

Paint and primer (732 sq ft) 

Remove screws and tacks in drywall 

Repair small screw holes in drywall. Mud, tape, paint and texture 

 

Kitchen  

Paint and primer (692 sq ft) 

Install baseboard trim (27 linear feet) 

Install new pantry interior door (2-0 RH) with passage doorknob and door stop 

Install new trim around doors and windows (56 linear feet) 

Install 6 new outlet cover plates (white) 

Install new base cabinets  

24” x2 

48” x2 blind corners 

36” 

27” 

21” 

Wall cabinets 

24” 

30” 

48” x2 blind corners 

36” x2 

21” 

33” 

Countertop measurements  

24 ½” 

48 ½” west wall 

140” north wall 

70” east wall 

 

Reminder: Dispose of all debris at an approved site. Clean the entire area around unit; this includes picking up all nails. Make sure the project is ready for final inspection.