Concrete Work in White Shield

Fort Berthold Housing Authority 

SCOPE OF WORK 

Material and Labor provided by Contractor 

 

Project: CRP3 Segment: White Shield 

 Bids are due by September 24, 2026. 

All driveways will be 5” thick, 3500 PSI minimum with #4 rebar (steel or fiberglass) 24” OC with 20” overlaps, and 6” class 5 subbase properly compacted.  

All sidewalks will be 4” thick, 3500 PSI minimum, and 6” class 5 subbase properly compacted. 

All patios will be 3500 PSI minimum with #4 rebar (steel or fiberglass) 24” OC with 20” overlaps and 6” class 5 subbase properly compacted.  

No more than 1 step into the front of the house and no steps in the back of the house. Backfill where needed to ensure zero entry as much as possible. 

Any cleanouts that are located where concrete is planned, make sure to reinforce with traffic-rated caps or protective boxes to prevent damage from vehicles while maintaining access for maintenance. 

FBHA will supply concrete testing. 

 

Unit 137 

Install the new driveway (12’x30’) where the old driveway was. Install new landing for front entrance (5’x6’). Install sidewalk (36’) connecting the front landing to driveway. Install patio (10’x12’) in front of patio door. 

 

Unit 138 

Install the new driveway (12’x30’) where the old driveway was. Install new landing for front entrance (5’x6’). Install sidewalk (36’) connecting the front landing to driveway. Install patio (10’x12’) in front of patio door. 

 

Unit 526 

Install new landing for front entrance (5’x6’). Install sidewalk (20’) connecting the front landing to driveway. Install pad (10’x12’) in front of patio door. 

 

Reminder: Dispose of all debris at an approved site. Clean the entire area around unit, this includes picking up all nails and trash. Make sure the project is ready for final inspection.